ROUTE SURVEY
For heavy and oversized cargo, we survey the route from port to site before it moves, so the transport plan works the first time.
What we check
- 01Road widths and turning radii
- 02Bridges, culverts and load limits
- 03Overhead obstructions and power lines
- 04Gradients and ground conditions
- 05Quay and storage areas at the port
- 06Permits and escorts the route will need
What you receive
- →Route survey report with measured constraints
- →Photographs and marked route maps
- →Recommendations for the transport plan